| |
|
- Developing and implementing Permit-compliance plans.
|
| |
|
|
 |
|
- Assessment of risks to health under COSHH 2002 regulations.
- Manual handling assessments.
- Assessment under Management of H&S at Work Regulations
- Assessment of environmental consequences for PPC and COMAH
|
|
|
|
- Design and implementation of EH&S Management Systems.
- Performing initial environmental reviews for ISO14001 and EMAS.
- Staged implementation of EMS under BS8555.
- Implementing H&S management systems to OHSAS 18001.
|
| |
|
|
| |
|
- Exposure measurements for toxic dusts, vapours, noise, thermal environment, etc.
- Measurement of emissions from process vents and fugitive losses.
- Measuring effectiveness of control systems (e.g. LEV, abatement equipment).
|
| |
|
|
| |
|
- Noise surveys and exposure assessments under the Control of Noise at Work Regulations 2005
- Selection and use of hearing protection
- Implementing a Hearing Conservation Programme
|
| |
|
|
| |
|
- Implementation of overall waste management programme.
- Review of legal compliance with UK and European waste legislation.
- Cost effective compliance with Packaging Waste Regulations 2005.
|
| |
|
|
| |
|
- Practical solutions to work place exposure situations.
- Identification of opportunities for least -cost waste and emissions reduction.
|
| |
|
|
| |
|
- Assessment and review of environmental and human health risks
- Development of Exposure Scenarios and Risk Management Measures
- Preparing Chemical Safety Reports
|
| |
|
|
| |
|
- Delivery of tailored EH&S training modules to staff.
- Briefings on legal developments and future trends.
|
| |
|
|
| |
|
- Review of LEV needs, system design, and preparing a specification
- Assistance with installation, commissioning and maintenance of LEV
- Statutory thorough examination and test
|